We devised and participated in the preparation of a series of physical planning, traffic and technical studies and expert reports which put forward original solutions and form the basis for development plans and physical planning documentation.

Awards

The Pećine Tunnel project on state road D404 was shortlisted for the International Tunnelling Award 2011 in the category of constructed tunnels with a value of up to $100 million. The Grič Tunnel on the A1 Motorway, designed by Rijekaprojekt, won second place at EuroTAP’s tunnel safety testing in 2006.

Certificates

We are implementing the Quality Management System (QMS) in line with the ISO 9001 standard.
On 23 July 2009, we obtained the ISO 9001:2008 Certificate for “DESIGN, STUDY DEVELOPMENT, PROJECT REVISION, CONSULTING AND EXPERT SUPERVISION IN THE FIELD OF CIVIL ENGINEERING”, issued by Bureau Veritas.

Studies and development projects

01 Urban traffic study: Zadar ferry port
Client: Zadar County
Rijekaprojekt - niskogradnja d.o.o Rijeka, Marinaprojekt d.o.o. Zadar , November 1996

02 Development program for the Sušak and Rijeka Basin,
Client: Port of Rijeka Authority,
Rijekaprojekt - niskogradnja d.o.o, April 1997 precise watches copy rolex

03 Traffic study – Passenger terminals in Rijeka,
Client: City of Rijeka
Rijekaprojekt- niskogradnja d.o.o. Rijeka_ May 1998

04 Study: Integral traffic study of the Šibenik-Knin County,
Client: Šibenik-Knin County, County Institute for Physical Planning
Rijekaprojekt - niskogradnja d.o.o Rijeka, December 1998.

05 Feasibility study for construction and management of the Adriatic Motorway Rijeka – Dubrovnik based on the concession for the section Rupa –Rijeka- Senj-Otočac of the Primorje-Lika segment,
Client: Hrvatske ceste d.o.o.
Rijekaprojekt - niskogradnja d.o.o, Rijeka, June 1999.

06 Prostorno prometna studija: Jadranska autocesta, dionica sv. Kuzam – Vodice krmpotske,
Client: Primorsko - goranska županija, Županijski zavod za razvoj, prostorno uređenje i zaštitu okoliša
Rijekaprojekt d.o.o. Rijeka, svibanj 2001

07 Urban traffic study of the high-speed road Kraljevica – Krk – Baška,
Client: Hrvatske ceste d.o.o.
Rijekaprojekt d.o.o. Rijeka, April 2004.

08 Study of the Adriatic-Ionian corridor for the Permani – Soboli – Križišće section,
Client: Hrvatske ceste d.o.o.
Rijekaprojekt d.o.o. Rijeka, May 2004.

09 Master plan for the Gaženica cargo port,
Client: Port of Zadar Authority,
Rijekaprojekt d.o.o., Rijeka, September 2006.

10 Urban traffic study of the motorway corridor within the Rijeka traffic junction,
Client: Hrvatske autoceste d.o.o.
Rijekaprojekt d.o.o. Rijeka, June 2007

11 Feasibility study for construction and management based on the concession for the Križišće - Žuta lokva section, A7 motorway: Rupa – Rijeka – Žuta lokva
Client: County of Primorje-Gorski Kotar, County Institute for Development, Physical Planning, and Environmental Protection
Rijekaprojekt d.o.o. Rijeka, April 2010.

12 Integral study of the urban traffic in the County of Primorje - Gorski Kotar and the City of Rijeka – road and marine traffic
Rijekaprojekt d.o.o. Rijeka, June 2010.

13 Technical and technological design - Container terminal on the island of Krk – Phase I,
Client: Port of Rijeka Authority
Rijekaprojekt d.o.o. Rijeka_December 2011

14 Physical planning and construction and technical analysis of ferry ports for connection of the northern part of the Island of Rab with the Island of Krk,
Client: Municipality of Lopar,
Rijekaprojekt d.o.o., Rijeka, July 2012.

15 Preliminary study for construction of second track and upgrade of existing track on railway line section Šapjane – Rijeka- Škrljevo – Kupjak (overall lenght 99 km ) Client: HŽ- infrastruktura d.o.o (Croatian Railways Infrastructure)

16 Republic of Croatia`s Transport Development Strategy 2014-2030,                            Consultans for Road sector, the Maritime transport sector and the Inland water sector, Beneficiary: Ministry of Maritime Affairs, Transport and Infrastructure, Zagreb, July 2014